6/20/2023 0 Comments Il genio dello streaming chernobylThe operators were ready to only partially restore the required test power, which put the reactor during a potentially unstable condition. On this fourth attempt, an unexpected 10-hour delay meant that an unprepared operating shift was on duty.ĭuring the planned decrease of reactor power in preparation for the electrical test, the facility unexpectedly dropped to a near-zero level. ![]() Three such tests had been conducted since 1982, but that they had did not provide an answer. it had been hoped to prove that the residual rotational energy during a turbine generator could provide enough power to hide the gap. This gap was about one minute and had been identified as a possible safety problem that would cause the reactor core to overheat. The test was a simulation of an electric power outage to assist the event of a security procedure for maintaining reactor cooling water circulation until the back-up electrical generators could provide power. ![]() ![]() The accident started during a security test on an RBMK-type reactor, which was commonly used throughout the Soviet Union.
0 Comments
Leave a Reply. |